Brian finished the pad. He even made the corners smooth so the kids could decorate it. Notice the turkey tracks to the left of Brian in the concrete.
Rick and Bruce watching Roger and Brian work on the pump.
Rick holding the hose while Andrew reconnects it.
The next day, Andrew and Roger continued to work on the pump. Andrew replaced the peristaltic hose and hoped that would fix the problem.
Brian giving Jack (dog) a ride in the Bobcat at the end of the work day. Roger walking down the hill behind him.
The inside of the dome on Saturday afternoon (end of day four).
Looking straight up the wall.